Jane Ross House

Dates
- Built: Unknown
Map
History
The Pool House behind the main structure was razed on September 2, 2025, in preparation for the new intramural greenspace.

The Pool House behind the main structure was razed on September 2, 2025, in preparation for the new intramural greenspace.